Carlos Echeverria & Sons Anaerobic Digester

Project Dates
2016-2017
Construction Cost
Est. $6 Million
Contact
Ross Buckenham
(559) 667-9560
Address
California Bioenergy
324 South Santa Fe Street,
Suite B
Visalia, CA 93292
Email
info@calbioenergy.com

Carlos Echeverria & Sons Anaerobic Digester

Bakersfield, CA

4CG Construction was selected to provide general contractor services for the Car-los Echeverria & Sons (CE&S) Dairy Anaerobic Digester. CE&S Dairy is a rough-ly 9,700 cow dairy facility in Bakersfield, bordered by Interstate 5 to the west and southwest, Old River Rd. to the east, Millux Rd. to the North, and existing dairy and agricultural land to the south. The anaerobic digester project con-sisted of construction of a dual-lined covered lagoon style digester, mechan-ical room with combustion engines, pumps, piping, electrical and upgrades to the existing mechanical separator. The digester pond has a 26.8M gallon capacity (550’ L x 380’ W).

Development Team: