Carlos Echeverria & Sons Anaerobic Digester

Project Dates
2016-2017
Address
California Bioenergy
324 South Santa Fe Street,
Suite B
Visalia, CA 93292
Email
info@calbioenergy.com

Carlos Echeverria & Sons Anaerobic Digester

Bakersfield, CA

4CG Construction was selected to provide general contractor services for the Carlos Echeverria & Sons (CE&S) Dairy Anaerobic Digester. CE&S Dairy is a rough-ly 9,700 cow dairy facility in Bakersfield, bordered by Interstate 5 to the west and southwest, Old River Rd. to the east, Millux Rd. to the North, and existing dairy and agricultural land to the south. The anaerobic digester project consisted of construction of a dual-lined covered lagoon style digester, mechanical room with combustion engines, pumps, piping, electrical and upgrades to the existing mechanical separator. The digester pond has a 26.8M gallon capacity (550’ L x 380’ W).

Development Team:

Related Projects